The Office of Information Technology will perform software upgrades on the University's wireless network. The upgrade is planned for Saturday, December 21st from 6 a.m. to 12 p.m. in all of the administrative and dorm/residential buildings on campus. There will be brief, rolling wireless outages, as the network equipment restarts. During the update, building occupants should utilize their mobile phones to dial 9-1-1 or to reach emergency services.

Below is the high level order of the upgrade schedule.

Central Dorm cluster. Beginning Saturday, December 21st, 2024 at 6:00 am. This portion of the upgrade is expected to conclude by Saturday, December 21st, 2024 at 8:00 am.

The following buildings will be affected:

  • Blair-Buyers-Hall
  • Bloomberg-Hall
  • Brown-Hall
  • Butler-College
  • Campbell-Hall
  • Class-of-1901-Laughlin-Hall
  • Class-of-1903-Hall
  • Class-of-1915-Hall
  • Class-of-1927-Clapp-Hall
  • Class-of-1937-Hall
  • Class-of-1938-Hall
  • Class-of-1939-Hall
  • Cuyler-Hall
  • Dod-Hall
  • Dodge-Osborn-Hall
  • Edwards-Hall
  • Feinberg-Hall
  • Foulke-Hall
  • Gauss-Hall
  • Hamilton-Hall
  • Henry-Hall
  • Holder-Hall
  • Joline-Hall
  • Little-Hall
  • Lockhart-Hall
  • Madison-Hall
  • Patton-Wright-Hall
  • Pyne-Hall
  • Rock-Magnetism-Laboratory
  • Scully-Hall
  • Spelman-Halls
  • Walker-Hall
  • Whitman-College
  • Witherspoon-Hall
  • Wu-Wilcox
  • Addy Hall
  • Aliya Kanji Hall
  • FU Hall
  • Grousbeck Hall
  • Hariri Hall
  • Jose Enrique Feliciano Hall
  • Kwanza Marion Jones Hall
  • Mannion Hall  

East West Dorm cluster. Beginning on Saturday, December 21st, 2024 at 6:00 am.  This portion of the upgrade is expected to conclude by Saturday, December 21st, 2024 at 8:00 am

The following buildings will be affected:

  • Alexander-St-99
  • Cap-Gown-Club
  • Charter-Club
  • Cloister-Club
  • Colonial-Club
  • Cottage-Club
  • Courtyard-Annex
  • Dickinson-St-11
  • Dickinson-St-15
  • Dickinson-St-16
  • Dickinson-St-2
  • Dickinson-St-24
  • Edwards-27-29
  • Edwards-Pl-31
  • Forbes-College
  • Graduate-College-New
  • Graduate-College-Old
  • GSH Building-A
  • GSH Building-B
  • GSH Building-C
  • Ivy-Club
  • Lakeside Apts
  • Lawrence-Apartments
  • Prospect-Ave-21
  • Quadrangle-Club
  • Terrace-Club
  • Tiger-Inn-Club
  • Tower-Club
  • University-Pl-35
  • University-Pl-45
  • Wyman-House

Central Admin cluster.  Beginning after completion of both Dorm clusters, on Saturday, December 21st, 2024 between 7:00-8:00 am. This portion of the upgrade is expected to conclude by Saturday, December 21st, 2024 at 10:00 am.

The following buildings will be affected:

  • Alexander-Hall
  • Alexander-Hall-RichardsonAud
  • Alexander-St-228
  • Alexander-St-262
  • Architecture-Building
  • Athletic-Team-Room-Trailers
  • Baker-Rink
  • Carl-C-Icahn-Laboratory
  • Chapel
  • Chilled-Water-Plant
  • Class-of-1879-Marx-Hall
  • Class-of-1952-Stadium
  • Class-of-1952-Stadium-Field
  • Clio-Hall
  • Dickinson-Hall
  • Dillon-Court
  • Dillon-Gymnasium
  • East-Pyne-Building
  • Elm-Dr-200
  • Eno-Hall
  • Firestone-Library
  • Frist-Campus-Center
  • GBM-Office-Trailer
  • Guyot-Moffett-Schultz
  • Henry-House
  • Jones-Hall
  • Lewis-Arts-Center
  • Maclean-House
  • MacMillan-Building
  • McCormick-Hall
  • McCosh-Hall
  • McCosh-Infirmary
  • Morrison-Hall
  • Murray-Theatre
  • Nassau-Hall
  • New-South-Building
  • Princeton-Neuroscience-Institute
  • Princeton-Station
  • Prospect-House
  • Sanitation-Trailer
  • Scheide-Caldwell-House
  • Stanhope-Hall
  • Thomas-Laboratory
  • University-Pl-36
  • University-Pl-48
  • Whig-Hall
  • Woolworth-Music-Center

East West Admin cluster. Beginning after completion of both Dorm clusters, Saturday, December 21st, 2024 between 7:00-8:00 am. This portion of the upgrade is expected to conclude by Saturday, December 21st, 2024 at 10:00 am.

The following buildings will be affected:

  • Aaron-Burr-Hall
  • Alexander-Rd-693
  • Alexander-Rd-755
  • Alexander-St-282
  • Alexander-St-294
  • Alexander-St-306
  • Alexander-St-350
  • Alexander-St-600
  • Alexander-St-619
  • Andlinger-Center
  • Architectural-Laboratory
  • Auxiliary-Library
  • Bendheim-Center-For-Finance
  • Bobst-Hall
  • Bowen-Hall
  • Broadmead-171
  • Broadmead-185
  • Building 17 - Hopewell Research Facility 
  • Caldwell-Field-House
  • Campus-Club
  • Carnegie-Ctr-701
  • Center-for-Jewish-Life
  • Chambers-St-22
  • Chambers-St-34
  • Charlton-Street-Substation
  • Clarke-Field-Press-Box
  • College-Rd-West-26
  • Computer-Science-Building
  • CUB Energy
  • DeNunzio-Pool
  • Eden-Way-Substation
  • Edwards-Pl-17
  • Elementary-Particles-Lab-West
  • EQuad-A-Wing
  • EQuad-B-Wing
  • EQuad-C-Wing
  • EQuad-D-Wing
  • EQuad-E-Wing
  • EQuad-F-Wing
  • EQuad-G-Wing
  • EQuad-J-Wing
  • Fine-Hall
  • Fisher-Hall
  • Forrestal-Rd-700-PUAM
  • Frick-Chemistry-Laboratory
  • Friend-Center
  • Gas-Dynamics-Laboratory
  • Green-Hall
  • Haaga-House
  • Helm-Building
  • High-Performance-Computing-Research-Center
  • Hoyt-Chemical-Laboratory
  • Ivy-Ln-5
  • Jadwin-Gymnasium
  • Jadwin-Hall
  • Julis-Romo-Rabinowitz-Building
  • Lewis-Library
  • Lowrie-House
  • McCarter-Theatre
  • McDonnell-Hall
  • Meadows Parking Garage
  • Mercer-St-4
  • Mudd-Manuscript-Library
  • Mullet-Building
  • Nassau-St-112
  • Nassau-St-114
  • Nassau-St-158
  • Nassau-St-169
  • Nassau-St-179&183
  • Nassau-St-185
  • Nassau-St-192
  • Nassau-St-194
  • Nassau-St-199
  • Nassau-St-201
  • Nassau-St-221
  • OIT-POP-Building
  • Overlook-Ctr-100
  • Palmer-House
  • Peyton-Hall
  • Princeton-Stadium
  • Printing&Mailing-Services
  • Prospect-Ave-58
  • Prospect-Ave-91
  • RECAP
  • Reunions
  • Robertson-Hall
  • Sayre-Hall-2A
  • Shea-Rowing-Center
  • Sherrerd-Hall
  • Stockton-St-16
  • Strubing-Field-Dugout
  • University-Pl-71
  • Von-Neumann-Hall
  • Wallace-Hall
  • William-St-41
  • Roberts Stadium
  • TIGER Energy Plant
  • Prospect St Garage
  • Stadium Drive Garage